Viewing 29 results ...

Abdenour, J I (2021) A cost estimation model for improving the budget estimates of industrial plant construction projects, Unpublished PhD Thesis, , The George Washington University.

Adoko, M T (2016) Developing a cost overrun predictive model for complex systems development projects, Unpublished PhD Thesis, , The George Washington University.

Alves, L F (2006) Stochastic approach to risk assessment of project finance structures under public private partnerships, Unpublished PhD Thesis, , The George Washington University.

Bersson, T F (2012) A framework for application of system engineering process models to sustainable design of high performance buildings, Unpublished PhD Thesis, , George Washington University.

Boyer, E J (2012) Building capacity for cross-sector collaboration: How transportation agencies develop skills and systems to manage public-private partnerships, Unpublished PhD Thesis, , The George Washington University.

Charoenphol, D (2017) Using robust statistical methodology to evaluate the performance of project delivery systems: A case study of horizontal construction, Unpublished PhD Thesis, , George Washington University.

Cho, S (2000) Sequential estimation and decision-making in project management: A Bayesian way and heuristic approaches, Unpublished PhD Thesis, , The George Washington University.

Elsherbiny, A (2021) Prediction of design error rework cost in EPC industrial projects, Unpublished PhD Thesis, , George Washington University.

Farmer, C M (2018) Constructing program management offices for major defense acquisition programs: Factors to consider, Unpublished PhD Thesis, , The George Washington University.

Griffin, M G (2008) The lived experience of first line managers during planned organizational change: A phenomenological study of one firm in the residential construction industry, Unpublished PhD Thesis, , The George Washington University.

Holmlin, R M (2016) Pre-design methodology for establishing scope-budget and scope-duration alignment for capital projects, Unpublished PhD Thesis, , George Washington University.

Innocent, M J F, Jr. (2018) Predicting military construction project time outcomes using data analytics, Unpublished PhD Thesis, , The George Washington University.

Joao, Z R (2021) Road construction assessment model (RC-AM) to prevent contract overbilling in Angola, Unpublished PhD Thesis, , George Washington University.

Kim, E (2000) A study on the effective implementation of earned value management methodology, Unpublished PhD Thesis, , The George Washington University.

  • Type: Thesis
  • Keywords: competition; flexibility; best practice; earned value management; government; value management; case study; project manager
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/304592425
  • Abstract:
    For several decades Earned Value Management (EVM) has been applied largely by the agencies of the US Government in their large acquisition programs. However, due to increasing current global competition and rapid technological developments, greater use of EVM has been seen by many organizations as a way to achieve better control of their projects and, hence, better performance. To assist in applying EVM more efficiently to projects in various industries and government agencies, this research primarily addresses two questions: (1) How might a general model or framework, including a set of practical guidelines, for establishing and implementing EVM methodology within organizations be designed? and (2) What types of modifications, if any, to the general model and guidelines may be necessary for application in different types of organizations (e.g., public and private; large and small projects)? As part of the research, six site visits entailing in-depth individual case studies as well as a 2,500-person survey were carried out along with a comprehensive literature review. The data sources included national EVM experts, renowned researchers, and project managers. Several significant findings arise from this study. Among them are (1) Current EVM methodology is in the midst of rapid changes and the existing scholarly literature is not fully in touch with what is happening in the EVM methodology area; (2) A broader approach to considering together four factor groups (i.e., EVM users, EVM methodology, implementation process, and project environment) as reflected in the model developed during this research can significantly improve the acceptance and performance of EVM; (3) No significant difference was found in applying EVM in projects of different sizes or types. Rather, the best practice is to allow flexibility to project managers to design their own EVM applications within overall guidelines; (4) As part of the model developed from this research, more than twenty specific guidelines were identified for project managers to adopt for the better implementation of EVM; and (5) Significant improvements in the acceptance and utility of EVM appear to be arising from rapid developments in information technology—in the form of advanced computers, sophisticated software, and electronic data interchange.

Krone, S J (1991) Decreasing the impact of changes, Unpublished PhD Thesis, , George Washington University.

Lounsbury, C R (1983) From craft to industry: The building process in North Carolina in the nineteenth century, Unpublished PhD Thesis, , The George Washington University.

McDavid, H A (1996) Construction and economic development: A stimulus or constraint in developing countries, Unpublished PhD Thesis, , George Washington University.

Momtazi, S (2021) Reducing cost overruns in construction projects using lean methodology, Unpublished PhD Thesis, , George Washington University.

Ngamthampunpol, D (2008) An assessment of safety management in the Thai construction industry, Unpublished PhD Thesis, , The George Washington University.

Park, J (2015) Essays on the delivery of public infrastructure projects: Empirical analyses on transportation projects in Florida, Unpublished PhD Thesis, , The George Washington University.

Reid, J S (2019) Evaluating the impact of using agile methodologies in heavy-civil construction, Unpublished PhD Thesis, , George Washington University.

Schulte, W D, Jr. (1999) The effect of international corporate strategies and information and communication technologies on competitive advantage and firm performance: An exploratory study of the international engineering, procurement and construction (IEPC) industry, Unpublished PhD Thesis, , The George Washington University.

Shamma, E M (1988) A dynamic model for the growth of construction firms, Unpublished PhD Thesis, , The George Washington University.

Stuban, S M F (2011) Employing risk management to control military construction costs, Unpublished PhD Thesis, , George Washington University.

Taku, A M (2021) Predicting modular efficiency in oil and gas capital projects using multi-criteria decision analysis, Unpublished PhD Thesis, , The George Washington University.

Toliver, B L (2018) Implementing project management plans to control construction costs on military projects in Korea, Unpublished PhD Thesis, , George Washington University.

Tonimoghadam, F (2021) A predictive model for reducing cost and time for the detection of clashes in residential and commercial constructions projects, Unpublished PhD Thesis, , George Washington University.

Wenzelberger, J P (1987) The economic analysis of tall buildings (Milwaukee, Wisconsin; Boston, Massachusetts; Kansas City, Missouri), Unpublished PhD Thesis, , George Washington University.

Zhou, G (2021) Machine learning-based cost predictive model for better operating expenditure estimations of U.S. light rail transit projects, Unpublished PhD Thesis, , The George Washington University.